[1] 张殿业,金键,杨京帅. 铁路运输安全理论与技术体系[J]. 中国铁道科学, 2005,26(3): 114-118. ZHANG Dianye, JIN Jian, YANG Jingshuai. Theoretic and technical research framework of railway transportation safety[J]. China Railway Science, 2005, 26(3): 114-118. [2] 卢春房,王德. 中国高铁安全运营技术体系与保障措施[J]. 中国安全科学学报, 2019, 29(8): 1-9. LU Chunfang, WANG De. Technology system and guarantee measures for safety operation of high-speed railways in China[J]. China Safety Science Journal, 2019, 29(8): 1-9. [3] 李程睿,赵明,尹盼盼,等. 高速铁路客运站安全评价[J]. 中国安全科学学报, 2019, 29(增2): 149-153. LI Chengrui, ZHAO Ming, YIN Panpan, et al. Safety evaluation of high-speed railway passenger station[J]. China Safety Science Journal, 2019, 29(S2): 149-153. [4] ZWANEVELD P J, KROON L G, HOESEL S P M V. Routing trains through a railway station based on a node packing model[J]. European Journal of Operational Research, 2001, 128(1): 14-33. [5] ZWANEVELD P J, KROON L G, ROMEIJN E, et al. Routing trains through railway stations model formulation and algorithms[J]. Transportation Science, 1996, 30(3): 181-194. [6] KROON L G, ROMEIJN H E, ZWANEVELD P J. Routing trains through railway stations: Complexity Issues[J]. European Journal of Operational Research, 1997, 98(3): 485-498. [7] CARDILLO D D L, MIONE N. k L-list λ coloring of graphs[J]. European Journal of Operational Research, 1998, 106(1): 160-164. [8] 史峰,谢楚农,于桂芳. 铁路车站咽喉区进路排列优化方法[J]. 铁道学报, 2004, 26(4): 5-9. SHI Feng, XIE Chunong, YU Guifang. Optimization methods for arranging train routes in station bottleneck[J]. Journal of the China Railway Society, 2004, 26(4): 5-9. [9] 彭其渊,张永祥,鲁工圆,等. 基于时空资源的铁路客运站到发线运用调整[J]. 同济大学学报:自然科学版, 2019, 47(7): 1 011-1 021. PENG Qiyuan, ZHANG Yongxiang, LU Gongyuan et al. Arrival and departure tracks utilization adjustment method in railway passenger stations based on time-space resources[J]. Journal of Tongji University:Natural Science, 2019, 47(7): 1 011-1 021. [10] 赵鹏,宋文波,陈霞,等. 大型铁路客运站到发线与咽喉区综合运用优化[J]. 北京交通大学学报, 2015, 39(6): 1-7. ZHAO Peng, SONG Wenbo, CHEN Xia, et al. Comprehensive optimization for utilization of arrival-departure tracks and throat area in large railway passenger station[J]. Journal of Beijing Jiaotong University, 2015, 39(6): 1-7. [11] BORNDRFER R, SCHLECHTE T, WEIDER S. Railway track allocation by rapid branching [C]. Proceedings of the 10th Workshop on Algorithmic Approaches for Transportation Modelling, Optimization, and Systems, 2010: 13-23. [12] 马驷,孙建康,鲁工圆. 高速铁路车站列车进路分配方案的优化与调整[J]. 中国铁道科学, 2018, 39(1): 122-130. MA Si, SUN Jiankang, LU Gongyuan. Optimization and adjustment of train route allocation scheme for high speed railway station[J]. China Railway Science, 2018, 39(1): 122-130. [13] 贾文峥,毛保华,何天健,等. 大型客运站股道分配问题的模型和算法[J]. 铁道学报,2010,32(2): 8-13. JIA Wenzheng, MAO Baohua, HE Tianjian, et al. Model and Algorithm for track allocation at large-scale railway passenger stations[J]. Journal of the China Railway Society, 2010, 32(2): 8-13. [14] 白紫熙,周磊山,王劲,等. 基于拉格朗日的高速铁路车站作业优化[J]. 交通运输系统工程与信息, 2014, 14(4): 120-125. BAI Zixi, ZHOU Leishan, WANG Jin, et al. A Lagrangian Relaxation model for high-speed railway station operation[J]. Journal of Transportation Systems Engineering and Information Technology, 2014, 14(4): 120-125. [15] 刘源. 高速铁路车站进路分配问题优化研究[D]. 北京:北京交通大学,2015. LIU Yuan. Study on optimization of route assignment problem in high-railway station[D]. Beijing: Beijing Jiaotong University, 2015. [16] 文超,杨雄,黄平,等. 铁路列车运行冲突检测与消解理论研究综述[J]. 中国安全科学学报, 2018, 28(增2): 66-73. WEN Chao, YANG Xiong, HUANG Ping, et al. Review on conflict detection and resolution on railway train operation[J]. China Safety Science Journal, 2018, 28(S2): 66-73. [17] 吕伟,李志红,冯满满,等. 考虑资源和时间窗约束的应急物资调配模型[J]. 中国安全科学学报, 2019, 29(12): 137-143. LYU Wei, LI Zhihong, FENG Manman et al. Emergency material allocation in consideration of resource and time window constraints[J]. China Safety Science Journal, 2019, 29(12): 137-143. [18] 邢文训. 现代优化计算方法[M].北京:清华大学出版社,2005: 113-119. |